
Acoustimac GO-Booth Graphic Printed Portable Vocal Booth System 6'x8'x2"
Portable Deployable Acoustic Treatment System
Built using two panels size 72"x24"x2" hinged together to form a modular assembly which can be used as:
- A portable vocal booth or enclosure
- Free-standing Partition divider
- Moveable Privacy Wall
- Backdrop for video production
Assembly folds for easy storage.
Folded size: 6'x2'x10" (two modules: 6'x2'x5") Unfolded size: 6'x8'x2" (two modules: 6'x4'x2")
Wrapped in full color Stock or Custom Art Printed Fabric
1 Image per segment, or 1 image across entire assembly.
Availability: In stock
Finally after a long wait our go-booths are finally ready for prime-time. These free Standing, compact, light and highly decorative panel modules, are available in all our fabric styles and we can even make them with custom printed graphics. Each two piece assembly folds for easy storage, and have a black painted wood backing.
Highly useful for dozens of applications:
• Use them to build a portable vocal booth enclosure
• Use them to divide and partition a larger space into two smaller spaces
• Use them as backdrops for video editing while capturing source audio.
• Use them to spot-treat problem areas in a space's acoustics
Here are some of the added advantages to our go-booth system
• Free Standing - Means, no holes, no drilling, no mounting, just open them up and you're done.
• Lightweight - Much lighter than most comparable products
• Economical - Many vocal booth systems are simply not affordable to those on a tight budget, our modules are priced lower than anyone out there.
• Look Great - Professional look for a hand-crafted professional grade product.
Folded size: 6'x2'x10" (two modules: 6'x2'x5") Unfolded size: 6'x8'x2" (two modules: 6'x4'x2")
CUSTOM SIZES AVAILABLE, CALL FOR DETAILS
| SKU | GOBOOTH682A |
|---|---|
| Weight (Lbs.) | 90.000000 |


