
Acoustimac GO-Booth Graphic Printed Desktop Vocal Booth System 4'x2'x2"
Portable Deployable Acoustic Treatment System
Built using three panels, one size 24"x24"x2", two sized 12"x24"x2" hinged together to form a modular assembly which makes the perfect desktop podcasting vocal booth. Full assembly measures 4'x2'x2" Wrapped in full color Stock or Custom Art Printed Fabric 1 Image per segment, or 1 image across entire assembly.
Availability: In stock
Finally after a long wait our desktop go-booths are finally ready for prime-time. These free Standing, compact, light and highly decorative panel modules, are available in all our fabric styles and we can even make them with custom printed graphics. Each three piece assembly folds for easy storage, and have a black painted wood backing.
Highly useful for dozens of applications:
• Podcasting
• Training Video Voice Overs
• Voice Acting
• Even normal Telephone and Headset Conversation
Here are some of the added advantages to our go-booth system
• Free Standing - Means, no holes, no drilling, no mounting, just open them up and you're done.
• Lightweight - Much lighter than most comparable products
• Economical - Many vocal booth systems are simply not affordable to those on a tight budget, our modules are priced lower than anyone out there.
• Look Great - Professional look for a hand-crafted professional grade product.
Folded size: 2'x2'x2" Unfolded size: 4'x2'x2")
CUSTOM SIZES AVAILABLE, CALL FOR DETAILS
| SKU | GOBOOTHDTA422 |
|---|---|
| Weight (Lbs.) | 10.000000 |


